Houston, TX  General Contractor Direct 281-942-8847|Mon-Fri|Log in
Start your project
Restaurant Construction
Sectors we build · Restaurants

Restaurant Construction

Restaurant build-outs and ground-up construction, built to the health department, the kitchen equipment plan, and the concept design at once.

← Back to Sectors

A restaurant build has to satisfy three different sets of requirements at the same time, a health department, a kitchen equipment plan, and a brand or concept design, and usually on a schedule set by a lease rather than by the construction itself. We build restaurants, both ground-up buildings and interior build-outs inside an existing shell, and we coordinate all three requirements as one project instead of three separate conversations.

The types of restaurant projects we take on

Restaurant work ranges from a single tenant build-out inside a retail shell to a standalone, ground-up restaurant building with its own site work and drive-through. Quick-service and fast-casual concepts carry a tighter kitchen footprint and a faster build cycle; full-service restaurants add dining room finish, bar space, and often a larger back-of-house. Renovation and remodel work, updating an existing restaurant to a new concept or a refreshed brand standard, is its own category again, usually built around the restaurant staying open for as much of the process as possible.

How we build it

The kitchen equipment plan drives the mechanical, electrical, and plumbing scope more than almost anything else in a restaurant build, hoods, grease traps, gas lines, and specialized power all have to land exactly where the equipment does. We coordinate that scope directly against the equipment plan and the health department's requirements from pre-construction on, rather than discovering a conflict once equipment shows up on site. Our own crews carry the finish trades, drywall, paint, tile, and millwork, through the dining room and back-of-house, so the same team responsible for the schedule is also responsible for the finish a guest sees on opening day.

What drives the cost and the schedule

Kitchen equipment coordination is the single biggest driver: a concept with a heavy hood and grease-trap requirement costs and schedules differently than a limited-equipment concept, regardless of square footage. Health department review adds a real approval step most other retail build-outs don't carry, and building to its requirements from the start avoids a failed inspection late in the schedule. Because most restaurant leases set a fixed open date, we build the schedule around that date from day one rather than treating it as a target to catch up to later.

We are licensed and insured, with over 20 years of combined experience delivering restaurant and retail interiors, and we self-perform the finish trades that most often decide whether a restaurant opens on the date the lease and the brand are counting on.

What we do

Kitchen equipment coordination

Mechanical, electrical, and plumbing scope built to the equipment plan, not around it.

Health department compliance

Built to health department requirements from pre-construction on, not caught at inspection.

Ground-up and interior build-outs

Standalone restaurant buildings and tenant build-outs inside an existing shell.

Lease-driven delivery

Construction sequenced to hit a lease's fixed open date.

Related guides

Where we build Restaurant Construction

We take on restaurant construction projects across the greater Houston area and beyond, including:

See every city we serve →

Licensed & insured
20+ years combined experience
In-house crews
On time and on budget

Have a project?

Let’s talk about your restaurant construction project.

Start your project

Frequently asked questions

Do you coordinate kitchen equipment installation?
Yes. Restaurant build-outs require close coordination between the equipment plan, the mechanical and electrical work behind it, and the health department's requirements, and we run all three together.
Can you build to a specific restaurant brand's concept design?
Yes. We build to whatever concept and finish package the brand or the owner specifies, the same way we would to any other brand standard.
How do health department requirements affect the schedule?
They set real, non-negotiable requirements for the kitchen and the finish, and we build to them from the start so an inspection does not stall the opening date.
Do you build ground-up restaurants or only interior build-outs?
Both. We build standalone restaurant buildings from the ground up and interior build-outs inside an existing shell.
Call 281-942-8847Start your project