Hotels

Home / What We Build / Hotels

Hotels

At our company, we specialize in both new construction and renovation of hotels. Our team of experienced professionals have a proven track record of delivering high-quality, functional, and stylish hotels that meet the needs of both guests and owners. From concept to completion, we work closely with our clients to understand their vision and bring it to life, ensuring that every detail is executed to perfection. Whether you’re looking to build a brand new hotel, or renovate an existing one, we have the expertise and resources to get the job done right. Trust us to bring your hotel project to life and create a welcoming and memorable experience for your guests.

Building a Hotel: a Snapshot of Our Process and Trades

Building a hotel is a complex and multi-faceted process that requires the coordination of many different trades and professionals. As the construction project manager, my role would be to oversee the entire process, from the initial planning stages to the final inspection, to ensure that the project is completed on time, within budget, and to the highest standards of quality.

  1. Pre-Construction Planning: This involves working with architects, engineers, and other professionals to develop a detailed plan for the hotel, including the design, budget, and schedule.

  2. Site Preparation: This includes clearing the site, grading the land, and preparing the foundation for the hotel.

  3. Framing: This involves the installation of the structural framework for the hotel, including the walls, roof, and flooring.

  4. Mechanical, Electrical, and Plumbing (MEP) Installation: This involves the installation of the hotel’s electrical, plumbing, and HVAC systems, as well as the installation of any fire suppression systems.

  5. Drywall and Finishing: This involves the installation of the interior walls and ceilings, as well as the application of paint, wallpaper, and other finishes.

  6. Flooring: This involves the installation of the hotel’s flooring, including carpet, tile, and hardwood.

  7. Millwork and Cabinetry: This involves the installation of custom millwork and cabinetry, such as built-in bookcases, desks, and other features.

  8. Tile Installation: This involves the installation of tile in the hotel’s bathrooms and other areas.

  9. Landscaping: This involves the design and installation of the hotel’s landscaping, including the planting of trees, shrubs, and flowers.

  10. Final Inspection: This is the final step in the process, where the hotel is inspected to ensure that it meets all of the necessary building codes and standards, and that it is ready for occupancy.

Throughout the entire process, I would work closely with the hotel owner and other stakeholders to ensure that the project is completed to their satisfaction and that their vision for the hotel is realized.

F1 1.jpg